Friday, October 9, 2009
7E,
Hope you breezed through the week. Don't brood over it. Just a few reminders:
1) Attendence is not compulsary on Monday. Monday after next is a holiday for Deepavali. 4 Mondays after (2 Nov, or next x4 Monday if you would prefer it...) is a holiday too.
2) Check your sabbatical allocation/venues/timings in the EMB message by Mr Nah, 8/10
3) ALL sabbaticals require an indemnity form to be signed, I refer to Miss Chua's (I don't think she's married, right?) message on 30/9
4) For those who have not submitted their I and R first drafts, please submit them by NEXT WEEK, although Ms Ong said that she would not be looking at any first drafts anymore, I think she's more than willing to have a look. She won't compromise on our PW grade
5) Important dates to remember: 30/10 Final Submission date for WR, 6-13/11 PW Oral Presentation, SHORTLY AFTER OP- Submission deadline for I&R
6) Doing work right after promos (a.k.a RDT tutorial, ETC) simply means that you need to get a social life.
7) Looking at the post-promo's schedule makes my stomach churn and my blood boil. Hence, I very grudgingly came up with this while waiting for training to start, for my sanity and yours. Its a 7E-specific post-promos schedule with venues (found in the blogpost above this).
I'm sorry that its not in an excel file and its not pretty. I do not have the technology at the moment
lotsaluv, me
Leonard
Updated.
Posted at: 6:25 PM